
In the shadow of the highest peak in the Hindu Kush, Tirich Mir Primary School is under construction. It won't open its doors without the funding to complete it and fill it with desks, books and light.
Tirich Mir Primary School is mid-construction — and even once the structure is finished, it will still need every desk, book, lab and light inside it. Right now, children study on borrowed tables and cold concrete, with no furniture, no clean water, and no power.




112 sets for students and teachers, dual-seater and standard.
Books, shelving, a reading corner, and basic lab equipment.
10 desktops with a solar power backup for reliable electricity.
A filtration and storage system for safe daily drinking water.
Repaired boundary wall, security gate, first aid, fire safety.
Sanitation upgrade and outdoor play equipment for recess.
In Chitral, families walk children through snow and river crossings to reach a classroom. Tirich Mir Primary School exists because that belief in education never needed convincing — it only needed a finished building to hold it.
Not a vague appeal. Fund a category, a classroom, or the full school, and receive photo verification and cost documentation for your records.
Choose what you'd like to fund. Our Aim Foundation will send photo proof once it reaches Tirich Mir.